Tolling Scenarios
The following scenarios were studied, but are not recommendations. They were
for analysis and comparison purposes and a way to get public feedback. Tolling a
facility requires approval by each state’s legislature. Actual toll rates will
depend on a final finance plan and will be set by the Oregon and Washington
state transportation commissions. Rates will be adjusted to keep pace with
inflation if implemented.
Toll I-5: Tolls collected northbound and southbound
| Scenario |
Description |
Toll rate range
2006 dollars |
Toll rate range
2018 dollars |
| 1A |
Draft EIS variable toll |
$1.00 to $2.00 |
$1.34 to $2.69 |
| 1B |
Lower than Draft EIS variable toll |
$1.00 to $1.50 |
$1.34 to $2.02 |
| 1C |
Fixed rate toll |
$1.65 |
$2.21 |
| 1D |
Additional price points during
the day |
$1.00 to $2.50 |
$1.34 to $3.36 |
| 1E |
1.5x Draft EIS variable toll |
$1.50 to $3.00 |
$2.02 to $4.04 |
| 1F |
2x Draft EIS variable toll |
$2.00 to $4.00 |
$2.69 to $5.38 |
| 1G |
3x Draft EIS variable toll |
$3.00 to $6.00 |
$4.04 to $8.07 |
Toll I-5 and I-205: Tolls collected one-way only
| Scenario |
Description |
Toll rate range
2006 dollars |
Toll rate range
2018 dollars |
| 2A |
Draft EIS variable toll on both
bridges |
$2.00 to $4.00 |
$2.69 to $5.38 |
| 2B |
Lower than Draft EIS variable
toll on both bridges |
$2.00 to $3.00 |
$2.69 to $4.04 |
| 2C |
Draft EIS variable toll
on I-5;
lower variable toll
on I-205 |
I-5: $2.00 to $4.00
I-205: $2.00 to $3.00 |
I-5: $2.69 to $5.38
I-205: $2.69to $4.04 |
Additional considerations
| No Toll |
Studied for comparison purposes only |
| Tolling during construction |
This option could be added to any scenario to raise up to $330 million
in additional funds and help manage congestion. |